Skip to content

fix(deps): update dependency sentry-sdk to v2.19.0 #813

fix(deps): update dependency sentry-sdk to v2.19.0

fix(deps): update dependency sentry-sdk to v2.19.0 #813

Triggered via push November 25, 2024 13:47
Status Failure
Total duration 6m 19s
Artifacts

ci.yml

on: push
Matrix: integration-tests
Fit to window
Zoom out
Zoom in

Annotations

5 errors
integration-tests (3.11, master)
Process completed with exit code 1.
integration-tests (3.11, open-release/redwood.master)
The job was canceled because "_3_11_master" failed.
integration-tests (3.11, open-release/redwood.master)
The operation was canceled.
integration-tests (3.11, open-release/quince.master)
The job was canceled because "_3_11_master" failed.
integration-tests (3.11, open-release/quince.master)
The operation was canceled.