Skip to content

build(deps): bump google.golang.org/protobuf from 1.33.0 to 1.34.2 #477

build(deps): bump google.golang.org/protobuf from 1.33.0 to 1.34.2

build(deps): bump google.golang.org/protobuf from 1.33.0 to 1.34.2 #477

Triggered via pull request June 11, 2024 12:26
Status Failure
Total duration 1m 18s
Artifacts

go.yaml

on: pull_request
Vet Go code
34s
Vet Go code
Matrix: Test with Go
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Test with Go (1.22)
Process completed with exit code 1.
Test with Go (1.20)
The job was canceled because "_1_22" failed.
Test with Go (1.20)
Process completed with exit code 1.
Test with Go (1.21)
The job was canceled because "_1_22" failed.
Test with Go (1.21)
Process completed with exit code 1.