chore: gnaw: upgrade to Go 1.22 and upgrade deps #42
Annotations
8 errors
build (3.10)
Process completed with exit code 1.
|
build (3.9)
Process completed with exit code 1.
|
build (3.12)
The job was canceled because "_3_10" failed.
|
build (3.12)
Process completed with exit code 1.
|
build (3.11)
The job was canceled because "_3_10" failed.
|
build (3.11)
Process completed with exit code 1.
|
build (3.13-dev)
The job was canceled because "_3_10" failed.
|
build (3.13-dev)
The operation was canceled.
|