Do Proposed BuildingSegments
need to match Baseline BuildingSegments
?
#1534
Labels
question
Further information is requested
To put this question into context, I am trying to understand how to write the RMD of a Proposed HVAC System (DOAS for example) that serves an entire building which includes multiple "building segments".
Would the proposed RMD have the same building segments as the baseline RMD, and one of the building segments is selected arbitrarily to contain the HVAC system, then every DOAS terminal is able to reference the DOAS HVAC system, even if it is outside of its building segment?