The main view of risk analysis consists of 4 distinct parts.
-
Access to the steps of the method: Click on the numbers from
1
to4
to access the menus which follow the step-by-step method (see Method steps call). -
Risk Analysis area: allows you to structure the assets of the analysis hierarchically by using the Drag and Drop function (hold down the left mouse button to move an asset). (See Information Risks and Operational Risks)
-
Asset library area: Asset storage. The drag-and-drop function must be used to place these assets in the analysis (to move them to the Risk Analysis Area) (see Library).
-
Contextual area of work in the analysis: Depending on the assets and active parts of the analysis, this area contains contextual elements of the work.
You can manage your analysis in two steps as follows:
-
First, click on the name of the analysis
-
Second, click on the three-dot context menu (if you hover your mouse over the menu, a tooltip 'Actions' appears)
When you click the three-dot context menu, the following options appear:
-
Edit risk analysis - use this option in case you want to modify your existing risk analysis. This option allows you to modify the name, the description of the analysis, and add or remove linked referential. The Edit risk analysis pop-up appears:
-
Import a risk analysis - you can import a complete risk analysis. The file format is JSON and the structure can be viewed by exporting an analysis. There are 2 possible options of the export:
-
By merging (default). When matched assets names are not duplicated in the library.
-
By duplication. When the library assets are duplicated in case if presented before. The analysis assets will also be duplicated.
-
Warning
|
An analysis can be only imported when the language of its creation is the same as the current analysis (into which import is performed)! |
-
Export the whole risk analysis - you can export the whole analysis with or without the assets library and the knowledge base. The export of the analysis can be done with the following options:
-
The export file can be protected by a password if it is set (Custom password option).
-
"Include assets library?" The whole assets library is included in the export if the option is selected.
-
"Include knowledge base?" The whole knowledge base is included in the export if the option is selected.
-
“Export with assessments?” All the evaluations are included. Optionally can be added or not different analysis evaluation criteria (Options section).
-
-
Delete risk analysis
If you click on the link 'Delete risk analysis', the following pop-up appears: