Feature: Test case validation and migration

When a BPMN process evolves (e.g. flow nodes are added, removed or changed in their sequence), already selected test cases may become invalid.

How does it work?

When the Camunda modeler plugin is activated (toggled), the path of every test case is validated. If at least one of the flow nodes does not exist anymore, one or multiple problems are issued and the test case is flagged as invalid.

order-fulfillment-invalid-path.png

Problem types

Problem Required action
Start node is missing Select a new start node
End node is missing Select a new end node
Path in between is invalid Choose between one of the possible paths
Path problem is unresolvable Select a new path

Migration mode

In the migration mode, the encountered problems can be resolved in any order. The BPMN model marks the currently selected problem:

  • Bright blue colored: the problem's start and/or end node
  • Light blue colored: nodes of the invalid path that are still existing

order-fulfillment-migration.png

Selection mode

In the selection mode, a specific action depending on the problem type (e.g. selection of a new end node, or choosing between possible paths) must be performed to migrate the path of the test case. Again the BPMN model marks the problem:

  • Bright blue colored: the problem's start and/or end node
  • When a selection is done, bright yellow colored: nodes that are present in the invalid and in the new path
  • When a selection is done, light yellow colored: new nodes that are not present in the invalid path

order-fulfillment-migration-selection.png

Automatic problem resolving

When a path in between is invalid and there is only one new path between those nodes possible, the test case will be migrated automatically without any user interaction.