You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
The button for Automated A/C Unit Factory states you get "30 Mechanical Parts + 6 Motors + 3 Spool of Wire -> 12 A/C Units/15MWh per Second" instead of 1.5 units a second you get.
Typo found in index.html Line 338.
The text was updated successfully, but these errors were encountered:
The button for Automated A/C Unit Factory states you get "30 Mechanical Parts + 6 Motors + 3 Spool of Wire -> 12 A/C Units/15MWh per Second" instead of 1.5 units a second you get.
Typo found in index.html Line 338.
The text was updated successfully, but these errors were encountered: